Development approval was obtained to:

  • Relocate and re-orientate the existing house
  • New rear addition to existing house
  • New carport and workshop structure

In accordance with Table 5.10.11—Flood overlay and Table 5.10.25— Waterway corridors overlay the proposed extensions and ancillary structures were accepted development where complying with the relevant codes. A flood report prepared by an RPEQ is provided as Attachment B.

In assessment Flood Overlay – Table 8.2.11.3.A—Self-assessable and assessable development a performance outcome was sought for AO1.3. An Engineering report was provided to demonstrate how the proposal will address overland flow, creek/waterway flooding and the waterway corridor.

Designer: GreenCoast Building Design